EasyManua.ls Logo

Pylontech Pelio-L-5.12

Pylontech Pelio-L-5.12
65 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
36
3) Lead out the cables from the top two terminals to the
inverter or the DC switches.
4.6 Make Communication Connection
1) Please keep the communication cables through the side
handle when connecting.
2) Connect the communication cables between battery
moduless: every stack has two pre-installed Linkport
cables, connect one by one from Module last to the Module
1 (from LinkPort0 to Linkport1).
Wire clips can be used to secure the wires.
Arrow to arrow

Other manuals for Pylontech Pelio-L-5.12

Related product manuals