36
3) Lead out the cables from the top two terminals to the
inverter or the DC switches.
4.6 Make Communication Connection
1) Please keep the communication cables through the side
handle when connecting.
2) Connect the communication cables between battery
moduless: every stack has two pre-installed Linkport
cables, connect one by one from Module last to the Module
1 (from LinkPort0 to Linkport1).
Wire clips can be used to secure the wires.
Arrow to arrow

Other manuals for Pylontech Pelio-L-5.12

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Pylontech Pelio-L-5.12 and is the answer not in the manual?

Pylontech Pelio-L-5.12 Specifications

General IconGeneral
BrandPylontech
ModelPelio-L-5.12
CategoryCamera Accessories
LanguageEnglish

Related product manuals