4. Installation and operation
4.1 Package items
Unpacking and check the Packing List
1) For battery module package:
Two power cables and one communication cable for each battery package:
Grounding cable:
2) For battery system connects to inverters:
Two long power cables (current capacity 120A, constant 100A) and one
communication cable for each energy storage system:
NOTE
These three cables are belonging to External Cable Kit, NOT in battery package.
They are in another extra small cable box. If there is anything missed please
contact dealer.