NOTE
After installation, do not forget to register online for full warranty:
http://www.pylontech.com.cn/service/support
NOTE
z To start the system, if has grid power, it should turn on the inverter at first, to avoid current
pulse of the inverter add on the battery bank.
z Between battery bank and inverter should install breaker to protect system safety.
z All the installation and operation must follow local electric standard.
D. Multiple Battery Groups CAN/RS485 Communication Cable Connection
19 / 23 18BQSV0801