980 HDMI Protocol Analyzer Application Guide – Source Compliance Test Automation Rev. A1
Page 2 Feb 14, 2013
Table of Contents
1 Overview – Test Automation for HDMI Source Devices 3
1.1 Workflow for Test Automation 3
1.1.1 One time tasks per source device under test 3
1.1.2 Making the physical connections 3
1.1.3 Running the Tests 4
2 Initial Test Setup Procedures 5
2.1 Establishing an Ethernet Session between the 980 and Automated Test System 5
2.1.1 Making the physical Ethernet connections 7
2.1.2 Setting the IP address of the 980 9
2.2 Connecting the HDMI Source DUT to the 980 12
2.3 Powering up the 980 5
2.3.1 Powering down the 980 6
2.4 Creating a Capabilities Declaration Form (CDF) 13
2.5 Acquiring a test EDID 14
3 Executing the Source Compliance Test 15
3.1 Establishing a Telnet Session with the 980 15
3.2 Moving the CDF to the proper directory 17
3.3 Assigning the Test EDID to the 980 Protocol Analyzer Rx port 17
3.4 Initiating the compliance test 18
3.4.1 Basic Protocol Test – Test ID 7-17 Example 19
3.4.2 Video Pixel Encoding RGB – Test ID 7-23 Example 22
3.4.3 Audio Clock Regeneration – Test ID 7-29 Example 25
3.4.4 4K Video Resolution – Test ID 7-39 Example 27
A. Appendix – Command Line Reference 31
A.1 980 Commands executed from pscope prompt 31
A.2 980 Compliance Test Script command 34