The installation process, tested and approved by professional electricians, consists of the
following simple steps:
Step 1 Turn OFF the fuse:
To prevent electrical shock and/or equipment damage, disconnect electrical power at
the main fuse or circuit breaker before installation and maintenance.
Be aware that even if the circuit breaker is off, some voltage may remain in the wires
before proceeding with the installation, be sure no voltage is present in the wiring.
Take extra precautions to avoid accidentally turning the device on during installation.