EasyManuals Logo
Home>Quectel>Control Unit>EC200U Series

Quectel EC200U Series Application Note

Quectel EC200U Series
29 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #16 background imageLoading...
Page #16 background image
LTE Standard Module Series
EC200U&EG915U_Series_PPP_Application_Note 15 / 28
5 PPP Connection Termination
There are two methods to terminate the PPP dial-up connection:
1. Terminate the PPP connection through the LCP Terminate-Request message, and this method is
recommended.
2. TA can also terminate the PPP connection by changing the DTR level. Set the DTR function by
AT&D2 first, change the DTR level from low to high, and the data connection will be automatically
terminated. After the PPP connection is completely terminated, the USB/UART port will enter the
command mode. Examples are as follows:
Example
//USB/UART port is still in command mode before PPP connection is established.
AT&D2
OK
NOTE

Other manuals for Quectel EC200U Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Quectel EC200U Series and is the answer not in the manual?

Quectel EC200U Series Specifications

General IconGeneral
BrandQuectel
ModelEC200U Series
CategoryControl Unit
LanguageEnglish

Related product manuals