EasyManua.ls Logo

Quectel LPWA Series

Quectel LPWA Series
91 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LPWA Module Series
BG950A-GL&BG951A-GL_Hardware_Design
34
/ 84
Figure 8: Turn on the Module a Button
The power-up scenario is illustrated in the following figure.
Figure 9: Power-up Timing
.
3. Ensure that VBAT is stable for at least 100 ms before pulling down the PWRKEY.
4. Pull PON_TRIG high before the module is turned on, and then drive PWRKEY low for 500–1000 ms
and release, otherwise, the main UART interface will be inaccessible.
NOTE

Table of Contents

Other manuals for Quectel LPWA Series

Related product manuals