Quest 876 Installation, Operation and Maintenance Instructions
6
www.QuestClimate.com
info@QuestClimate.com
4.3 Condensate Water Removal
Condensate drains by gravity via the drain port. Use 3/4” male NPT PVC pipe. An optional condensate pump kit may be
installed if a lift is required to dispose of the condensate. Optional parts list for information on the kit.
Follow Diagram
Level unit within 2°
4.4 Hanging Diagram
Hanging installation must meet all state and local codes.
Installation should be done by a qualified agency in accordance with these
instructions. The qualified service agency installing this high eciency
refrigeration system is responsible for the installation.
Parts Needed: 4 pieces 3/8” threaded rod (not included)
4 - 3/8” threaded jam nuts (not included)
3/4” drain port
Min 6”
28.95
27.25
3/8” threaded rod
Intake Air
Treated Air
3/8” Jam Nuts
5.56”