EasyManua.ls Logo

Quest Engineering MPS 3 - Page 48

Quest Engineering MPS 3
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MPS 3 and MPS 3 ND Troubleshooting Manual – Troubleshooting
198
Arrest over-delivery detected
Arrest has been turned off
CONFIRM OFF TURN ON
* Select CONFIRM OFF to
leave
Arrest pump off and continue
procedure
OR
* Select TURN ON to turn
Arrest
pump back on and continue
procedure
199
Arrest under-delivery detected
Check cartridge and circuit
CONFIRM RETEST
* Select CONFIRM to suspend
monitoring until next dose
OR
* Select RETEST to continue
monitoring
200
Additive cartridge not detected
Verify Additive cartridge installation
CONFIRM RETEST
* Check Additive Cartridge to
verify it is properly installed
and
fully secured to the pump
* If the cartridge was secure, try
removing cartridge and
reinserting it
* If the cartridge was secure, try
stopping and restarting
cardioplegia flow
* If error still persists, restart
console and try again
* Contact service after multiple
occurrences
201
Additive pump piston sensor error
Verify Additive cartridge installation
Additive pump is Off
CONFIRM RETEST
* Check Additive Cartridge to
verify it is properly installed
and
fully secured to the pump
* If the cartridge was secure, try
removing cartridge and
reinserting it
* If the cartridge was secure, try
stopping and restarting
cardioplegia flow
* If error still persists, restart
console and try again
* Contact service after multiple
occurrences
Alar
m
Cod
e
Message Display
Corrective Action
32

Other manuals for Quest Engineering MPS 3