EasyManua.ls Logo

Radiant R2K 55 - Default Chapter; Table of Contents

Radiant R2K 55
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
R2K 55 - RAD - ING - Inst.Manual - 2002.1_CSA
SUMMARY
INTRODUCTION 4
1. INSTALLER SECTION 7
1.1. INSTALLATION 8
1.1.1. GENERAL INSTALLATION WARNINGS 8
1.1.2. BOILER LOCATION ENVIRONMENTAL REQUIREMENTS 8
1.1.3. REFERENCE LEGISLATION 9
1.1.4. UNPACKING 10
1.1.5. OVERALL DIMENSIONS (inch) 11
1.1.6. HYDRAULIC CONNECTION KIT 11
1.1.7. POSITIONING AND CLEARANCES TO COMBUSTIBLE MATERIAL AND SERVICE CLEARANCES 12
1.1.9. CIRCULATOR PERFORMANCE CURVE 14
1.1.10. WATER CONNECTIONS 15
1.1.11. PRESSURE RELIEF VALVE KIT 16
1.1.12. SYSTEM FILLING 17
1.1.13. FILLING THE CONDENSATE COLLECTION SIPHON 18
1.1.14. ANTI-FREEZE PROTECTION 20
1.1.15. GAS CONNECTION 21
1.1.16. ELECTRICAL CONNECTION 21
1.1.17. POWER SUPPLY 22
1.1.18. OPTIONAL ELECTRICAL CONNECTIONS 23
1.1.19. VENTING 25
1.1.20. TYPES OF EXHAUST SYSTEMS 28
1.1.21. TABLE 1: ALLOWABLE VENT LENGTHS 33
2. SUPPORT CENTER SECTION 37
2.1. FIRST START-UP 38
2.1.1. PRELIMINARY OPERATIONS FOR FIRST START-UP 38
2.1.2. BOILER COMMISSIONING 39
2.1.3. CO2 VALUE CHECK AND CALIBRATION 40
2.1.4. ACCESSING AND PROGRAMMING THE PARAMETERS 41
2.1.5. DIGITECH CS (MIAH402) PARAMETERS TABLE 43
2.1.6. COMBUSTION BLOWER FREQUENCY/HEAT CAPACITY DIAGRAM 51
2.2. MAINTENANCE 52
2.2.7. GENERAL MAINTENANCE WARNINGS 52
2.2.8. TECHNICAL DATA 53
2.2.9. TECHNICAL ASSEMBLYTECHNICAL ASSEMBLY 55
2.2.10. INTERNAL PIPING SCHEMATIC 56
2.2.11. 3-WAY VALVE OPERATION 57
SUMMARY

Related product manuals