F
2 13/16"
52
6
27
29
27
6
H152
H155
H152
6
77
51
51
25
6
27
25
29
28
76
75
B
DETAIL A
27
H32
G
RAIL INSET
52
77
51
51
25
27
B
C
D
1. Place Rail Uprights with Handle Holes
(27)
on the ground and use a hammer to pound 1/4" T-Nuts
(H32)
into the Uprights (as shown in Detail A).
2. In the locations shown, place Rail Uprights
(25)
and Rail Uprights with Handle Holes
(27)
, with the
T-Nuts towards the inside of the set, and attach to Arched Facias
(51)
, 4 Hole Facia with Rope
Hole
(52)
, and Corner Facias
(29)
using #8 Hardware
(H155)
. Rail Uprights
(25) (27)
should be
flush with the outside edge of the Corner Facias
(29)
.
*NOTE: #8 Hardware (H152) used to attach 1 x 4 Rail Uprights (6) is shorter than the #8
Hardware (H155) used to attach 2 x 4 Rail Uprights (25) (27).
*NOTE: If installing Double Wall Wave Slide opposite of the swing beam (B), install Rail
Uprights (25) (27) in locations shown in RAIL INSET.
3. Center 1 x 4 Rail Uprights
(6)
between Corner Uprights and 2 x 4 Rail Uprights
(25) (27)
and attach
to Facias
(29) (51) (52)
using #8 Hardware
(H152)
.
4. Measure over
2 13/16"
from Corner Upright
(76)
and attach first Upright
(6)
to Top Joist
(77)
and 2
Hole Facia
(28)
. Gap the remaining Rail Uprights
(6)
approximately
2 13/16"
apart and attach
using #8 Hardware
(H152)
.
A
28
Step 11
Rail Uprights Installation