Do you have a question about the Ravaglioli RAV 635.1 ISI and is the answer not in the manual?
Type | Electro-hydraulic two post lift |
---|---|
Lifting capacity | 3500 kg |
Maximum Lifting Capacity | 3500 kg |
Motor power | 2.6 kW |
Frequency | 50 Hz |
Voltage | 400V/230V |
Lifting time | 45 s |
Details the number of pages in the manual.
Lists the safety devices equipped on the lift.
Discusses residual risks and their warning labels.
Lists mandatory precautions and warnings for operation.
Covers safe handling and initial setup procedures.
Details precautions for moving the machine to the installation site.
Specifies compliance with European directives and test coefficients.
Lists key technical characteristics of the lift.
Identifies and explains the functions of the lift's controls.
Refers to Table 1 for available optional accessories.
Lists site requirements like lighting, ventilation, and noise levels.
Details concrete requirements and reinforcement for floor installations.
Outlines recessed installation requirements and corner profiling.
Explains how to position platforms and connect hydraulic lines.
Details electrical connection procedures and safety requirements.
Guides on routing and connecting the power cable.
Covers installation of limit switches and connecting valves/gauges.
Instructions for connecting the pneumatic system.
Explains how to bleed air from the hydraulic system.
Details the process for synchronizing lift platforms.
Procedure for checking the hydraulic oil level.
Steps to activate and check all safety devices.
Describes how to anchor the lift and check platform alignment.
Details anchoring and platform levelness checks for floor installations.
Verifies the proper functioning of all installed safety devices.
Lists absolutely forbidden uses of the lift.
Guidance on using original accessories and rubber pads.
Emphasizes the need for trained and authorized personnel.
Lists crucial checks to perform before operating the lift.
Explains the function of each control and button.
Details how to perform an emergency descent without power.
Refers to section 4.15 for checking safety devices.
Step-by-step guide for changing hydraulic oil.
Instructions for cleaning solenoid valves.
Details the information required for ordering spare parts.
Refers to Fig. 46 for a summary of machine components.
Checklist for initial installation and setup verification.
Checklist for regular safety and maintenance inspections.