EasyManua.ls Logo

Raven PowerGlide AutoBoom - Calibration; Calibrating a System

Raven PowerGlide AutoBoom
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Manual # 016-0130-061 Rev A 10/06
3
C HAPTER
C
ALIBRATION
Calibrating a
System
Use this procedure if this is the first time you are calibrating the system.
1. Unfold the booms and lower them until the boom mounted wheels are
resting on the ground.
Important: Before beginning calibration, ensure that:
the hydraulic installation has been completed
the wheels are attached to the boom and are on the ground
the system hydraulics are warmed to normal operating
temperatures
the engine RPMs are adjusted to a level that allows full
hydraulic capacity
Pull type sprayers need to have the tractor hydraulics
running in a continuous flow mode.

Related product manuals