EasyManua.ls Logo

Raymarine ST70 - Commissioning

Raymarine ST70
26 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 3: Installation 13
4. Attach connection cable to the controller
5. Final fix
Ensure the controller is mounted securely.
3.2 Commissioning
The autopilot must be commissioned prior to use. For new systems this involves
calibrating the system, which is a safety-critical action.
Refer to the SPX SmartPilot System Commissioning Guide for instructions.
3. Rotate collar clockwise
(2 clicks) until it snaps
into the LOCKED position
1. Rotate collar to UNLOCKED position
2. Ensure cable end connector is
correctly oriented, then fully insert
D10422-1
87071-1.book Page 13 Monday, April 21, 2008 3:34 PM

Other manuals for Raymarine ST70

Related product manuals