Re S.p.A. WG251 SKB-C RESMART
22/11/12 6/25
Attention!
To ensure this instrument functions correctly, wait for at least 5 seconds between
switching it off and switching it on again.
Important!
Use shielded power supply cables only, and connect the shield to the earth point
located on the MWG10 unit. The earth point (represented in the drawing), must be
connected to the machine frame by a cable, that must be as short as possible; the
cable section must be 6mm
2
minimum.