EasyManua.ls Logo

RefPlus Opti-Mist Plus - Start-Up Report Form

RefPlus Opti-Mist Plus
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FILL OUT FORM MANUALLY, TAKE A PHOTO
AND SEND TO:
service@refplus.com
ONLINE FORM
OR
13
R
START-UP REPORT FORM
ADIABATIC SYSTEM
STARTUP REPORT FORM
IMPORTANT: This startup report form must be lled out, signed and sent to RefPlus for the warranty to be honoured.
PRE-START-UP (Check each item when completed, as recommended in this manual.
CHECK WATER SUPPLY (FOR CONNECTION AND PRESSURE)
CHECK AIR VENT (PROPER CONNECTION)
CHECK ATOMIZING NOZZLES FOR LEAKS (PROPERLY TIGHTENED)
CHECK PULSING VALVE FOR PROPER OPERATION
CHECK FILTER (PROPERLY IN PLACE)
CHECK ADIABATIC PUMP CURRENT CONSUMED
WATER SUPPLY PRESSURE
PSIG UNIT VOLTAGE
PUMP OUTLET PRESSURE PSIG
NAME OF INSTALLATION
TECHNICIAN: _____________________________________ SIGNATURE: _____________________________________________________