- 70 -
Indoor Blower Motors
v0.2
Final installation checks
Check all wiring and connections, especially those removed while servicing.
Ensure the system is setup as follows:
Verify the condensate drain is not plugged or clogged.
Reconnect the AC power to the HVAC system and verify that the new motor
control module is working properly.
Check and plug leaks in return ducts and equipment cabinet.
Verify that the system is running quietly and smoothly, in all modes (heating,
cooling, and continuous fan) and all stages (if applicable).
Return all thermostat settings to the customer’s preference.
Note: If this is a repeat failure, then it is important that you check the
following:
Any evidence of moisture requires correcting the issue.
If this area is subject to high amounts of lightning strikes, the use of
additional transient protection may be helpful.
Good Practices
Finish all service calls by checking all safeties, and perform a visual
inspection of the overall job to prevent call-backs.
Check the level of Carbon Monoxide (CO) in the vent(s) and living spaces of
all homes with fossil-fuel appliances.
Recommend annual maintenance