Equipment Operation
6-27
As an option the Power Tower
hinges forward for tight
overhead clearances such as
bridges and restricted storage
situations.
The tower features a fi berglass
framework with overhead
lights, all around navigation
light and/or ski pylon.
For highway towing the
Power Tower shall be upright and all canvas stowed in their
dedicated boots. All attached canvas bow hardware shall be
checked for tightness before and after towing.
Cockpit carpet shall be rolled up and stored in a dedicated cockpit
dry fl oor locker.
POWER TOWER