Taurus-C1 Training
34
Slide 34
PM Table
 The basic PM interval for the main machine is 300k. Many parts are
replaced at 300k or at a multiple of 300k. Some important exceptions are:
 Developer and development unit filters
» D074: 750K
» D075, M044: 900K
 Drum *
» D074: 980K
» D075, M044: 1100K
 ITB: 1600K
 PTR Lubricant Bar *
» D074: 450K
» D075, M044: 500K
 Fusing Unit *
» Fusing Belt, Hot Roller, Pressure Roller, Bearings, Thermistors, Lubrication of
Gears: 650K
 Web cleaning unit *: 450K
 Inspection and cleaning of all rollers is recommended every 100k. Replace
at 1000k.
 Lubrication of fusing unit parts is required. The procedures are in the
Replacement and Adjustment section of the service manual.
 See the PM tables in the service manual for details of PM intervals for all
parts, and for the peripherals, which have different schedules from the
main machine.
 The development unit is not a PM item.
 *: These components are part of units that can be replaced by TCRU trained
customers.
 There will be more detail about TCRU procedures later in the course.