Eclipse
®
Dock Shelter (620G, 620NH) Installation/Service/Owner's Manual Rite‑Hite
®
10 Publication: AMEN00141 2019-11-22
INSTALLATION
Canopy Header
Continued
WARNING
The canopy header is a self supporting unit.
Installing less than 6 anchors and/or insucient
anchor installation methods is dangerous and can
cause unit failure.
Metal sided buildings require special and
increased mounting support considerations.
1 anchor location is required into solid structure
(H) (Figure 11) on each side of the door opening.
All other mounting locations require a backer
plate and pipe spacers (as needed) on the inside
of the wall so the mounting bar and the wall will
ex together.
• If structure is not aligned with 1 of the
pre-drilled mounting holes. Drill new hole
which will replace the nearest pre-drilled
mounting hole.
• If no structure is existing in this area, it must
be added at the outermost pre-drilled mounting
hole, directly above the side pad. All other
locations require a backer plate and pipe
spacers (as needed).
G
F
H
Endcap
Drill
Side View
8. Review "Mounting Methods" on page 5.
9. Position top bar in brackets (F). Top bar must be
secured to building in 6 locations (G).
Top bar is pre‑drilled, but other holes may be drilled
in place of these in order to line up with building
structure or to avoid obstacles.
Figure 11