Preparing for use
R&S
®
FPC
10Getting Started 1328.7409.02 ─ 05
3 Preparing for use
Here, you can find basic information about setting up the product for the first time.
● Lifting and carrying..........................................................................................10
● Unpacking and checking the instrument......................................................... 10
● Choosing the operating site.............................................................................11
● Setting up the R&S FPC..................................................................................11
● Considerations for test setup.......................................................................... 13
● Connecting AC power..................................................................................... 14
● Turning the R&S FPC on and off.....................................................................14
3.1 Lifting and carrying
See "Lifting and carrying the product" on page 4.
3.2 Unpacking and checking the instrument
1. Unpack the R&S FPC carefully.
2. Retain the original packing materials. Use it when transporting or shipping the
R&S FPC later.
3. Using the delivery notes, check the equipment for completeness.
4. Check the R&S FPC for any damage.
If the delivery is incomplete or the equipment is damaged, contact Rohde &
Schwarz.
Unpacking and checking the instrument