EasyManua.ls Logo

Rotary 2000 Series - Final Adjustments and Testing; Door Bumper and Latch Cable Installation; Pressure Test and Bleeding; Equalizer Cable Tension Check

Rotary 2000 Series
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21
Long Bumper
Short
Bumper
Padded section
of door bumper
faces out.
21"
(533mm)
18. Door Bumper Installation:
A) Press long bumper on column edge, Fig. 28.
B) Press short bumper on top edge of carriage tube, Fig.
28.
19. Latch Cable Adjustment:
A) Check to make sure the latch will properly engage and
disengage. Slowly release the latch handle. A 1/8”
(3mm) gap between the top of the latch dog and the
column is allowable.
B) When raising, listen to latches to be sure that both latch
dogs fall into latch slots. If they do not, loosen clamp
and adjust tension as necessary.
C) Install left latch cover using 5/16-18NC x 3/8” lg PHMS.
20. Pressure Test: Run lift to full rise and keep motor
running for 5 seconds. Stop and check all hose
connections. Tighten or reseal if required. Repeat air
bleeding of cylinders.
Fig. 28
Fig. 29
21. Equalizer Cable Adjustment: Raise lift to check
equalizer cable tension. Below carriage, grasp adjacent
cables between thumb and forenger, with about 15 lbs.
effort you should just pull the cables together. Adjust at
upper tie-offs, Fig. 29.

Related product manuals