MODEL F73(17603)
27
3.4. Parameter settlement
① Service TimeT1
Water Treatment Capacity:
Q=V
R
×K÷Y
D
(m
3
)
Hardness of Inlet Water (mmol/L).
Exchange factor (mmol/L) 400~1000.
Down-flow regeneration, 400~750;
Up-flow regeneration, 450~1000.
If the inlet water hardness is higher,
the factor is smaller.
Resin volume (m
3
).
By hours:T1=Q÷Q
h
(Hour)
Water treatment capacity per hour
(m
3
/h)
Water treatment capacity(m
3
)
By days: T1=Q÷Q
d
(天 )
Water treatment capacity per day
(m
3
/d)
Water treatment capacity (m
3
)
② Backwash time T2
It is subject to the turbidity of inlet water. Generally, it is suggested to
be set 10~15 minutes. The higher the turbidity is, the longer backwash
time can be set. However, if the turbidity is more than 5FTU, it should be
better to install a filter in front of the exchanger.
③ Brine & slow rinse time T3
T3=(40~50)×H
R
(min.)
Generally, T3=45H
R
(min.)
In this formula, H
R
——Height of Exchange tank resin (m).
④ Brine refill time T4
Down-flow regeneration: T4=0.45×V
R