MAINTENANCE
MAINTENANCE SCHEDULE
Before
each use
After 1st month
or 20 hours of
operation
Every 3 months
or 50 hours of
operation
Every 6 months
or 100 hours
of operation
Every year or
after 300 hours
of operation
Check engine lubricant
n
Change engine lubricant
n n
Check air lter
n
Clean air lter
n
Change air lter
n
Check/adjust spark plug
n
Replace spark plug
n
Check/adjust idle speed
n
Check/adjust valve
clearance
1
n
Clean fuel tank and lter
1
n
Check fuel hose
n n
Fuel lter Inspect Replace
Check all hose connections
n n
Inspect fuel tank vapor vent
(if equipped)
n n
Inspect carbon canister
(CARB models only)
n n
1. These items should only be carried out by an authorised service centre.
NOTE: Maintenance should be performed more frequently when generator is used in dusty areas.
When the generator has exceeded the maximum figures specified in the table, maintenance should still be cycled
according to the intervals of time or hours stated herein.