EasyManua.ls Logo

SAB Heli Division Goblin RAW 700 User Manual

SAB Heli Division Goblin RAW 700
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Question and Answer IconNeed help?

Do you have a question about the SAB Heli Division Goblin RAW 700 and is the answer not in the manual?

SAB Heli Division Goblin RAW 700 Specifications

General IconGeneral
Main Rotor Diameter700mm
Tail Rotor Diameter105mm
ESC160-200A
TypeRadio-Controlled Helicopter
Battery12S LiPo
Tail Rotor Ratio4.5:1
Cyclic ServosStandard Size
Tail ServoStandard Size

Summary

Introduction to Goblin Raw Helicopter

Very Important Information

Crucial safety and registration information for the helicopter model.

Goblin Raw Technical Specifications

Important Notes and Guidelines

Safety Guidelines for Operation

Essential precautions for safe operation and handling of the model.

Damage Limitation Clause

Manufacturer's liability limitations regarding product damage.

Limited Product Warranty

Details of product warranty coverage and exclusions.

Assembly Preparation Notes

Required Components and Tools

List of external parts, tools, lubricants, and adhesives for assembly.

Assembly Instructions Overview

Guidance on steps, symbols, and thread locker usage.

Carbon Rod Assembly Procedure

Transmission Group Assembly

Swashplate Servos Assembly

Frame Group Assembly

Head Assembly

Uniball Radius Arm Assembly

Step-by-step guide for assembling uniball radius arms.

Center Hub Assembly

Instructions for assembling the central hub component.

Radius Arm Assembly

Details on assembling the radius arms for the head.

Linkage Rod A Assembly

Assembly steps for the first set of linkage rods.

Assembling of the Modules

Swashplate Assembly

Instructions for assembling the swashplate mechanism.

Head Group Assembly

Steps for assembling the main head components.

Linkage Rod B Assembly

Assembly procedure for the second set of linkage rods.

Tensioner Assembly

Lower Side Frame Installation

Landing Gear Installation

Installation of the Motor/ESC

Transmission Setup Recommendations

Guidance on selecting appropriate gear ratios for motor and ESC.

Goblin Raw Configurations

Table detailing recommended motor, ESC, battery, and pitch settings.

Motor Belt Tensioning

Steps for correctly tensioning the motor drive belt.

Tail Group Assembly

Tail Boom Assembly

Tool Kit Assembly and Use

Instructions on using the tool kit for belt tensioning.

Battery Guide Assembly

Installation of FBL/RX

FBL/RX Plate Assembly

Guide for mounting the Flight Controller and Receiver plates.

Installation of the Canopy

Battery Installation and Preparation

Battery Securing Procedures

Instructions for securing batteries for optimal center of gravity.

Important Flight Preparation Checks

Final checks before flight, including battery pin and tray adjustment.

In Flight Operations

Operations Before First Flight

Pre-flight checks and setup procedures for safe operation.

Understanding the Head System

Explanation of the HPS head dampening system and its components.

Maintenance Schedule and Procedures

Transmission Module Maintenance

Main Shaft Replacement Guide

Detailed steps for replacing the main shaft and related components.

Assembly Check List

Spare Parts Catalog

Related product manuals