Commissioning
Before you finish
FOR RIGHT PUMP UNIVERSALS, ENSURE
THAT THE PREASSURE VESSEL IS FITTED
TO THE BRASS CONNECTION ON THE
TOP OF THE PUMP WITH THE ½” RUBBER
WASHER AND IS HAND TIGHT.
• Flush inlet pipework and carefully fill
pump with water by discharging water
from the outlet flexible coupler into a
container.
• Fit pump inlet filters.
It is CRITICAL to discharge water through
the pump into a container using natural
flow before connecting the pump to
outlet pipework in order to ensure
the air has been discharged from inlet
pipework and pump chambers. This
will not happen if the outlet pipework
is connected to the pump. The best
method is:-
Figure 19
• Open shower mixer valve/system outlets
to maximum hot and cold to check the
natural flow (unpumped) flow of at least
1 litre per minute – positive head systems.
• Open hot water outlets fully for
5 to 6 seconds and then turn outlets off.
Then open cold water outlets fully for
5 to 6 seconds and turn outlets off. If
flow is poor and inconsistent repeat
above steps until flow is steady.
• Repeat 2-3 times.
MAX
60˚C
HC
The hot connection
must be via an approved
side or top entry flange
!
!
• Connect discharge pipework.
• Check that all the pump isolating
valves are open.
• Fill system. Check for leaks.
• DO NOT RUN PUMP DRY – to do so
will cause irreparable damage to
your pump and will invalidate your
warranty.