EasyManua.ls Logo

Samsung AM Series - Ceiling Installation

Samsung AM Series
35 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
Ceiling installation
300mm or more
300mm or more
It is recommended to install the Y-joint before installing the indoor
unit.
1 Select pipe directions.
When the directions are selected, drill 3-1/8''-(100mm, for pipe and
cables) and 1-3/4''-(40mm, for drain hose) diameter holes on the wall
so that it slants slightly downwards toward the outdoor for smooth
water ow.
Use the pattern sheet to select pipe directions.
NOTE
2 Drill holes for anchor bolts according to the distance and mount them.
Use the pattern sheet.
NOTE
3 Insert bolt anchors. Use existing ceiling supports or construct a
suitable support as shown in figure.
4 Install the suspension bolts depending on the ceiling type.
Ensure that the ceiling is strong enough to support the weight
of the indoor unit. Before hanging the unit, test the strength of
each attached suspension bolt.
If the length of suspension bolt is more than 1.5m, it is required
to prevent vibration.
If this is not possible, create an opening on the false ceiling in
order to be able to use it to perform the required operations on
the indoor unit.
CAUTION
5 Screw eight nuts to the suspension bolts making space for hang-
ing the indoor unit.
You must install all the suspension rods.
NOTE
6 When Hanging the Set, firstly unscrew the screws from the both of
sides, and then disassemble the Case-sides, or else the case-side will
be damaged by disassembling it directly.
Ceiling
Wall
50mm
Ceiling support
Unscrew two screws from the both of sides.
Concrete
Suspension bolt(M10)-field supply
Hole in anchor
hole in plug
Insert

Other manuals for Samsung AM Series

Related product manuals