EasyManua.ls Logo

Samsung AM007FN1DCH/AA - Page 170

Samsung AM007FN1DCH/AA
344 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Troubleshooting
4-6 Samsung Electronics
غ
Forced defrost operation
ـ Forced defrost operation : Is operation when Frost Formation occurs in the outdoor. (When carried out the service)
غ
Forced oil recovery operation
ـ Forced oil recovery operation : Oil recovery in the outdoor unit for the purpose of moving, installation if necessary.
Method of Entry K2 Tact Switch 6 times
Start pattern Heating commissioning pattern
Defrost start Defrost start : It is after 10 minutes which Safety Start finishes.
Defrost off General defrost operation conditions are the same as.
Etc. Defrost shut down and stop the normal pattern of the outdoor unit stop.
Method of Entry K2 Tact Switch 7 times
Start pattern Outdoor temperature is more than 10°C : Cooling commissioning
Outdoor temperature is less than 10°C : Heating commissioning
Oil recovery start Oil recovery start : It is after 10 minutes which Safety Start finishes.
Etc. Oil recovery shut down and stop the normal pattern of the outdoor unit stop.

Table of Contents

Related product manuals