EasyManua.ls Logo

Samsung AM060FXMDEH - Using the PCB Switch

Samsung AM060FXMDEH
66 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
62
Using the PCB Switch
Switch is located on the main PCB.
1. Check the power between DVM Hydro unit / Hydro unit HT and the distribution board.
- Single phase: L, N
- Three phase: R, S, T, N
2. Check the outdoor unit.
1) Check if power and communication cable of the outdoor unit is connected properly. (Communication cable between
the DVM Hydro unit / Hydro unit HT and the outdoor unit should be connected to F1, F2)
2) Check the connection of the temperature sensor, drain pump and display etc.
3. Press the [K1] button to check the information on status of DVM Hydro unit / Hydro unit HT as shown in the below table.
[K1] Number of press Displayed contents
Display
SEG1 SEG2 SEG3 SEG4
1 Capacity of DVM Hydro unit / Hydro unit HT 1
25000W 250
2 Set temperature 2
27 °C 027
3 Current temperature 3
27 °C 027
4 Room temperature 4
27 °C 027
5 EVA IN temperature 5
-17 °C -17
6 EVA OUT temperature 6
-17 °C -17
7 WATER IN temperature 7
-17 °C -17
8 WATER OUT temperature 8
-17 °C -17
9 Hot water tank temperature 9
27 °C 027
10 Defrost bypass valve A
ON 000 / OFF 001
11 Pump output B
ON 000 / OFF 001
12 Flow switch input C
ON 001 / OFF 000
13 EEV Step D
1400 140
14 Current targeted degree of super heat E
3 °C 003
15 DVM Hydro unit / Hydro unit HT address F
01 001
16 Version
2012/10/29 CA29
4. When there are more than one error, press the [K2] button to check the errors.
[K2] Number of press Displayed contents
1 Currently displayed error
2 Most recently occurred error 1
3 Most recently occurred error 2
k}tGokyvGo{ptXYWZ`]]hTXluUGGG]Y YWXZTW_TW]GGG㝘㤸G`a[[a\\

Other manuals for Samsung AM060FXMDEH

Related product manuals