Connecting Up and Purging the Circuit
The air in the indoor unit and in the pipe must be purged. If air remains in the
refrigeration pipes, it will affect the compressor, reduce to cooling/heating capacity and
could lead to a malfuction. Refrigerant for air purging is not charged in the outdoor unit.
Use Vacuum Pump as shown at the right figure. Each unit must be purged in turn.
C A U T I O N
Vacuum
Pump
Indoor
A-unit
Indoor
B-unit
Valve stem
Stem cap
Service port
Valve stem
Stem cap
Service port
Vacuum
Pump
COMPLETING THE INSTALLATION
 MH040FXEA2A / MH052FXEA2A / MH18VV1X/MH19VV1X
1
Check the piping connections.
2
Connect the charging hose of low pressure side of manifold gauge to the
packed valve having a service port (MH040FXEA2A:3/8” service valve 2EA;
MH052FXEA2A:3/8” service valve 1EA+1/2” service valve 1EA) as shown at the
figure.
3
Open the valve of the low pressure side of manifold gauge counter-clockwise.
4
Purge the air from the system using vacuum pump for about 10 minutes.
- Close the valve of the low pressure side of manifold gauge clockwise.
- Make sure that pressure gauge show -0.1MPa(-76cmHg) after about 10
minutes.
This procedure is very important in order to avoid gas leak.
- Turn off the vacuum pump
- Remove the hose of the low pressure side of manifold gauge.
5
Set valve cork of both liquid side and gas side of packed valve to the open
position.
6
Mount the valve stem nuts and the service port cap to the valve,
and tighten them at the torque of 183kgf•cm with a torque wrench.
7
Check for gas leakage.
- At this time, especially check for gas leakage from the 3-way valve’s stem
nuts, and from the service port cap..
Indoor
A-unit
Indoor
B-unit
Indoor
C-unit
 MH060FXEA3A
1
Check the piping connections.
2
Connect the charging hose of low pressure side of manifold gauge to the
packed valve having a service port ( 3/8” service valve 2EA 1/2” service valve
1EA, at first connect A-unit & B-unit. After do 3~4, connect C-unit.) as shown at
the figure.
3
Open the valve of the low pressure side of manifold gauge counter-clockwise.
4
Purge the air from the system using vacuum pump for about 10 minutes.
- Close the valve of the low pressure side of manifold gauge clockwise.
- Make sure that pressure gauge show -0.1MPa(-76cmHg) after about 10
minutes.
This procedure is very important in order to avoid gas leak.
- Turn off the vacuum pump
- Remove the hose of the low pressure side of manifold gauge.
5
Set valve cork of both liquid side and gas side of packed valve to the open
position.
6
Mount the valve stem nuts and the service port cap to the valve,
and tighten them at the torque of 183kgf•cm with a torque wrench.
7
Check for gas leakage.
- At this time, especially check for gas leakage from the 3-way valve’s stem
nuts, and from the service port cap.