EasyManua.ls Logo

Sanyo C4272R S/C - Page 33

Sanyo C4272R S/C
111 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
33
X
(d) Installing the ceiling panel
Attach the ceiling panel to the chamber. Drawing the
panel downwards sets the panel in position temporarily
with the panel catch (at 2 locations).
Remove the socket cover of the air-intake plenum and
pass the 8P sockets through it. (Fix the panel lead wire
with the chamber side clamp.) (Fig. 3-17)
Connect the 8P socket (electrical component box side)
to the 8P socket (ceiling panel side) of the indoor unit
electrical component box.
Reattach the socket cover.
Ceiling panel
Panel catch
Installation screws
(M4 × 1/2 in.)
Duct
connection
flange
Duct connection box
Fig. 3-18
07-115 SSHP_II 5/7/07 3:59 PM Page 33

Table of Contents

Related product manuals