NOTE
1. In case of the Gear Motor installation, check if the value
of the Fig. 2-2-B is correct.
2. When installing the wire of the PCB630 install it correctly
as Fig. 2-2-C.
Manual soldering conditions
• Solderin
erature: 350 ± 5
o
C
• Soldering time: Within 4 seconds
• Soldering combination: Sn-3.0Ag-0.5Cu
3. When installing the Feed Rack Ass'y, push both ends to
align the teeth as shown Fig. 2-2-D. Then install it.
4. After the assembly of the Traverse Ass'y, hook the wire
• In case of remove FEED MOTOR that has to arrange wire as following
on the Traverse Ass'y as shown Fig. 2-2-E.
the picture on above.
2.3: SPRING SHUTTER/PLATE HOLDER/SHUTTER ROLLER
7.0 ± 0.1mm
ASS'Y/ROLLER ASS'Y/GEAR ROLLER/LUMIRROR WASHER/
ROLLER CONE/SHAFT ROLLER
(Refer to Fig. 2-3-A)
1. Remove the Spring Shutter.
2. Remove the screw (1).
3. Unlock the support (2).
4. Remove the Plate Holder.
5. Remove the Shutter Roller Ass'y.
.
~FEED MOTOR~
7. Remove the Gear Roller.
8. Remove the Lumirror Washer.
9. Remove the Roller Cone.
10. Remove the Shaft Roller.
Feed Rack Ass'y
(OK) (NG)
• Screw Torque: 3.0 ± 0.3kgf•cm (Screw (1))