i
CD PLAYER ADJUSTMENTS
a. REPLACEMENT AND LUBRICATION OF THE PICK-UP
Q
-#
(1)
(2)
(3)
(4)
(5)
(6)
(7)
Remove Ihe pick-up advance gear (2).
Remove the brackets (6) securing the pick-up rail in place.
V*
*
—
FLOIL (G-425A)
Pull out the pick-up rail (5).
1
If the pick-up is reconditioned or replaced, be sure [o wipe
the rails clean and also apply a coaling of FLOIL (G-425A)
10 their entire circumference and
enlire length.
After replacement, inslall the shaft as before.
The pick-up P.C.Board pattern is
“shorted”, as shown in
the figure , so that the new pick-up will not be susceptible to
Ihe effects of static.
FLOI
Set the pattern to “Open” after the pick-up has been
(G-425A) I
replaced.
P
“a
7 w~~
FLOIL ~ I
1
(G-425A) ~ I
\
SHORT ~ OPEN
NOTE ;
● In order to prevent damage by static electricity
during shipment, the indicated patterns on the
pick-up P.C. Board are short-circuited by solder.
● After the pick-up replacement, remove the
solder that is short-circuiting the patterns.
b.
REPLACEMENT OF THE SLED MOTOR
● Check the position of the red mark on the bottom of the
motor, as shown in the diagram.
c. LUBRICATION OF THE CD MECHANISM
. Be sure, at this time, not to touch any oiher part.
● NOTE : FLOIL (G-425A)
-6
FLOIi_(G-425A)
~
“432,
~FLOIL
(
/10
-8-