Preparing for the Installation
Consideration should be made for various factors such as their location, type of mounting (surface, dual-faced
or flag mounted), electrical wiring run, and more. Please read the manual including all relevant sections for your
specific installation configuration to understand the steps, how to wire, and how to install the clock. In addition,
please note what hardware you may need to supply.
The clock can be Surface (wall) Mounted, Dual-Faced or Flag Mounted.
Mounting the clock housing for these different configurations is different from one another; however, clock
display installation and wiring is similar. Therefore, each mounting will have its own initial installation instructions
section followed by a “Uniform Stage Installation section.
For installing the clocks, the installer will need to have the below items which are not provided with the clocks:
A #2 Phillips-head screwdriver
Electrical wires for power (Recommended 12, 14 or 16 AWG)
A drill and a drill bit (size depending on wall anchor)
A flat-head screwdriver
In Addition:
For a Surface (wall) Mounted Clock:
A double gang (utility) box
For a Dual-Faced or a Flag Mounted Clock:
A double gang (utility) box
There are 4 holes in the pole base plate that would accommodate size #8 screws for fixating it to the
ceiling or to the wall. Hardware to fixate the pole base plate to the ceiling or to the wall depending on
the type of wall is to be provided by the installer.