1 Before commissioning
Before putting the device into operation, check the delivery for any transport damage
to the packaging, the plastic case and the device itself. If this is the case, contact
SAUTER immediately.
2 General operating information
Functions of the digital torque measuring instrument that are used most frequently (i.e.
display of the torque value, peak hold function, zeroing and changing the displayed
unit) can be called up by pressing a corresponding button on the front panel (see
paragraph Basic functions of the measuring instrument). The setting of the measuring
instrument is done with the menu key (see paragraph Main menu).
3 Initial commissioning
The SAUTER DB digital torque measuring instrument is equipped with a battery set
consisting of 4 rechargeable AAA NiMH batteries. To be on the safe side, the
rechargeable batteries are completely discharged for transport and separated from the
power supply. Insert batteries before using the unit for the first time. To achieve
maximum battery life, recharge the batteries for at least 14-16 hours using the mains
adapter supplied.
4 Weight and dimensions
Torque
tester
DB 0.5-4
DB 1-4
DB 5-3
DB 10-3
DB 20-3
DB 50-2
Dimension
(LxWxH)
200x100x50mm
Weight
2.5kg
3.5kg
Packaging
Plastic case
Torque tester
DB 100-2
DB 200-2
DB 500-2
Dimension
(LxWxH)
200x100x50
Weight
3.5kg
4kg
Packaging
Plastic case