3.3. Be careful not to place the leaf outside the axis (Fig. 15
and 16), but make sure the shaft corresponds to the hinge
rotation axis remembering that the minimum distance from the
pillar is 1,8 inches (Fig. 17).
Fig. 15
Fig. 16
Fig. 17
1,8 inches min.
opening
motor motor
4.2. Introduce manually the operator into the inside of the
carrying box (Fig. 19-20) and fix the operator with the 4 screws
of the box using the furnished washers and nuts.
Fig. 18
4. INSTALLATION OF THE OPERATOR
4.1. It is important to distinguish the right hand and the left
hand side operator, anyway the motor must always be turned
against the opening side.
Make reference to Fig. 18.
Fig. 19
Fig. 20
LEFT-HAND SIDE
MOUNTING
RIGHT-HAND
SIDE
MOUNTING
International registered trademark n. 2.777.971
MECHANICAL INSTALLATION
FIELD
67410825 Rev.04 - 02/2016