INSTALLATION
MANUAL
Section 3: COOLING INSTALLATION
3.0 Introduction
The Seakeeper 26 is shipped with the cooling circuit filled and ready for use. Only a quick confirmation
of glycol level is required.
Reference Drawings
90244 Seakeeper 26 Gyro Hardware Scope of Supply
90310 Seakeeper 26 Gyro Cable Block Diagram
90320 Seakeeper 26 Gyro Cooling Water Schematic
FIGURE 1 – SEAKEEPER 26 GYRO