EasyManua.ls Logo

Sears 721.80513 - Page 6

Sears 721.80513
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGLISH
6
PARTS, TOOLS, MATERIALS
Clear Tape
(for taping the templates to the wall)
Phillips Screwdriver (for the screws)
Pencil
Flat Blade Screwdriver (for the bolts) Plumb Line
Measuring Tape (metal preferred) Duct Tape
Small Side Cutters or Tin Snips
Gloves
Caulking gun
Stud Finder or Thin Nail
Saber Saw (for cutting vent holes for roof
or wall vending)
Keyhole Saw (for the power cord hole)
YOU WILL NEED THE FOLLOWING TOOLS AND MATERIALS FOR THE
INSTALLATION:
Carton or other heavy material for covering the counter top.
3/8" and 3/4" wood drill bits
1/2" and 3/16"
drill bits
Electric drill
If you have brick or masonry walls, you need special hardware and tools.
The ductwork you need for the installation is not included. All wall and roof caps must have a back-draft
damper.

Related product manuals