EasyManua.ls Logo

Segway x2 SE - x2 SE Fender Frame Service

Segway x2 SE
148 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
38
Batteries
The two PT Batteries are sealed units (when properly installed) that require
no maintenance other than proper charging and storage. The Batteries are
interchangeable and can each be installed in either the front or rear of the
Powerbase. For the PT to operate, both Batteries must be installed, and both
must be of the same chemistry/manufacture type. If one Battery fails or is
depleted beyond its safe limit, the PT will perform a Safety Shutdown.
For more information on Safety Shutdown, see "Safety Shutdown" (p. 57).
Figure 23: Battery Location

Table of Contents

Other manuals for Segway x2 SE

Related product manuals