Introduction
This instruction will show how to setup and install a managed Lithium battery with a Selectronic SP PRO
series II in either a single phase system or Advanced Multiphase system (Three phase or Split phase).
The managed battery Installation kits are not suitable for SP PRO Series I products.
This installation note is applicable to the following installation kits.
1 Communications Card
Assorted Cables
1 Communications Card
Assorted Cables
Advanced Two (Split) Phase Kit
2 Communications Cards
Assorted Cables
3 Communications Cards
Assorted Cables
NOTES:
The Advanced Multiphase kits (005307 and 005304) include all of the components required to
install a multiphase system with managed batteries.
When installing an Advanced Multiphase system, also refer to installation guide:
IN0052_xx Installation of an Advanced Multiphase system.
Each application will have a minimum battery capacity and a maximum allowable PV, please refer
to the battery manufacturers data sheet.
In an Advance Multiphase system the CAN bus cable is ONLY connected from the battery bank to
the L1 SP PRO. There is no connection to the CAN on either the L2 or L3 SP PRO.