IN0051 Revision 05 (005293)– 2 of 26
POWER PERFORMANCE PASSION
SP PRO Interactive Inverter Charger
Refer to the table below to understand which installation kit is the right choice for your application.
Note that the table below is equally applicable to both on-grid and off-grid systems.
Installation Kit Order code for each
System Application
BYD B-Plus 2.5 modules
(in B-Box RES or PRO),
B-Plus L 3.5 modules,
Battery-Box Pro 13.8,
Battery-Box Pro 16.5
Sonnenschein@home
Lithium 6.8 or 9.0
LG Chem RESU 3.3, 6.5,
10, 13
LG Chem Stand-Alone
modules (LG Chem Rack
Mount)
P – The pre-charge/Battery sense wiring must be installed when using a BYD battery in an Advance
Multi-phase (AMP) system. See Installation note
IN0052_xx 005303 Installation of an Advanced
Multiphase system.
S – The battery fuse or circuit breaker must be turned ON before the battery bank is started (button
press on the master battery) when using the LG Chem Stand-Alone modules.
These install kits are required where a battery requires management between the SP PRO and
battery via CAN bus communications. If your chosen battery requires CAN bus connection and is
NOT on the list above, it cannot be used.