EasyManua.ls Logo

Sennheiser AC 3 - Putting the AC 3 into Operation; Preparing the AC 3 for Use

Sennheiser AC 3
39 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AC 3 | 7
Putting the AC 3 into operation
Putting the AC 3 into operation
Preparing the AC 3 for use
Setting up the AC 3 on a flat surface
Place the AC 3 on a flat, horizontal surface.
Fastening the
stacking elements
To fasten the stacking elements :
Unscrew and remove the two recessed head screws (M4x8)
on each side of the AC 3.
Secure the stacking elements to the sides of the AC 3
using the previously removed recessed head screws (see
diagram).
The stacking elements (see “Accessories” on page 15)
are designed to help protect the operating elements
from damage or deformation, e.g. if the AC 3 is
dropped.
Fasten the stacking elements even if you do not
want to stack your AC 3.
Do not fasten the stacking elements when mounting
the AC 3 into a 19” rack (see page 9).

Related product manuals