20 Jetflush Rapid
V1- 02-15
Section B – Using the Jetflush Rapid pump for power flushing
POWER FLUSHING SURVEY AND CHECK LIST
Date:
Address:
Name of householder/property owner:
Tel:
Why does system need flushing?
Recommendation by
other company
Previous survey New boiler installation
British Gas/other?
Type of system:
Vented Sealed Fully pumped Gravity hot
water
Thermal
store
(Need to
cap off cold
feed and
expansion
pipes)
(Is there a
non return
valve on
return side
of radiator
circuit?) Can
gravity circuit
be closed off?
Need valve to
be fitted?
(Need to
drain down
and loop
out cylinder,
and flush
radiator and
boiler circuits
separately)
Age of system:
Boiler Radiators Pipework
Jetflush Rapid Guidelines (19-02-15).indd 20 19/02/2015 12:13