EasyManua.ls Logo

Setec Power DC Quick EV Charger - Instruction; Location; Installation Procedure

Setec Power DC Quick EV Charger
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
INSTALLATION
Location
For the best operating conditions and longest life, take care in selecting
an installation site.
Operating life and performance will be influenced by charger location.
Select a dry and well-ventilated location.
Do not install charging station in locations where it may be exposed to
direct sunlight and inclement weather. Recommend to install waterproof
shed.
The front of the charger must remain unobstructed for serviceability.
Installation Procedure
The 20KW wall mount charger can be fixed on the wall.
Insert two power Modules into the shell
Fixed one part on the wall, other part on the charger.