INSTALLATION
Location
①
For the best operating conditions and longest life, take care in selecting
an installation site.
Operating life and performance will be influenced by charger location.
②
Select a dry and well-ventilated location.
③
Do not install charging station in locations where it may be exposed to
direct sunlight and inclement weather. Recommend to install waterproof
shed.
④
The front of the charger must remain unobstructed for serviceability.
Installation Procedure
The 20KW wall mount charger can be fixed on the wall.
① Insert two power Modules into the shell
②
Fixed one part on the wall, other part on the charger.