36
3 Operation
Once the rst comment has been entered, the Open
stored comments function will become available.
The stored measurements can be displayed on a computer using
a readout program. The program is available at www.sewerin.
com.
Starting a measurement
1. Press Menu.
2. Select Start measurement from the menu. This starts meas-
urement plot recording.
Measurement plot recording must always be concluded with Stop
measurement.
Stopping a measurement
1. Press Stop measurement.
OR
a) Press Menu.
b) Select Stop measurement from the menu.
2. Answer Yes to the warning prompt.
3. Enter a comment for the measurement.
a) Select the characters required using the jog dial. Conrm
each character using the jog dial.
OR
− Press Open stored comments. A list of the stored com-
ments will appear.
− Select the desired comment. Open the comment with OK.
b) Then conrm your entry/selection with OK.
OR
Press Esc if you do not wish to enter a comment for the
measurement.
The measurement is saved as a protocol. The protocol name
is formed from the date, time and comment.