EasyManua.ls Logo

Sharp AY-XPC12JHR - Full Power Operation; Activating, Deactivating, and Notes; Maintenance; Safety and Filter Cleaning Procedures

Sharp AY-XPC12JHR
116 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GB-12
MAINTENANCE
3
2
1
1
2
3
In this operation, the air conditioner works at the
maximum power to makes the room cool or warm
so rapidly that you can use it just after you come
home.
1
To activate the FULL POWER operation,
press the FULL POWER button during
operation.
The remote control will display “ ”.
The temperature display will go off.
The green FULL POWER lamp (
) on
the unit will light up.
TO CANCEL
Press the FULL POWER button again.
FULL POWER operation will also be cancelled
when the operation mode is changed, or when the
unit is turned off.
The green FULL POWER lamp ( ) on the unit
will turn off.
NOTE:
You can not set the temperature or fan speed
during the FULL POWER operation.
FULL POWER OPERATION
1
Filter cover
BEFORE PERFORMING
MAINTENANCE
Be sure to disconnect the power cord from the
wall outlet or turn off the circuit breaker before
performing any maintenance.
1
Turn off the unit.
2
Wait 15 seconds or more after the open
panel is completely closed, and turn off
the circuit breaker.
CLEANING THE FILTERS
The air lters should be cleaned every two weeks.
1
Turn off the unit.
2
Remove the lters.
1
Lift the lter cover.
2
Push the air filters up slightly to unlock
them.
3
Pull the air lters down to remove them.
3
Take off the air purifying lters from the
air lters.
4
Clean the lters.
Use a vacuum cleaner to remove dust. If the
lters are dirty, wash them with warm water and
a mild detergent. Dry lters in the shade before
reinstalling.
5
Reinstall the air purifying lters.
6
Reinstall the lters.
1
Reinstall the lters in the original positions.
2
Close the lter cover.
3
Push the arrow-marked of the panel rmly
to lock it in place.

Table of Contents

Related product manuals