EasyManua.ls Logo

Sharp MX-M623U

Sharp MX-M623U
104 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MX-M753N MX-PN10 8 – 3
E. Installation of the punch dust sensor unit
1) Install the harness guide of the punch dust sensor unit.
2) Fix the punch dust sensor unit with the screw A.
3) Connect the connector of the punch dust sensor harness to
the punch control PWB.
F. Installation of the external outfit
1) Cut out the punch cover by using a pair of diagonal cutters.
2) Install the punch cover, and fix it with the screw.
3) Attach the punch jam process guidance label to the punch
cover.

Other manuals for Sharp MX-M623U

Related product manuals