EasyManua.ls Logo

Sharp R-8200E

Sharp R-8200E
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TEST PROCEDURES (CONT’D!
PROCEDURE
NUMBER
9
COMPONENT TEST
SURGE LIMITING RELAY TEST
Disconnect the wire leads from relay coil terminals (A) and (B). A continuity check of the surge limiting relay coil
should indicate approximately 3000 ohms.
Check if there is a continuity between the contacts (15) and (16) of relay with the relay plunger depressed.
If the relay is defective, check the surge limiting resistor at the same time.
.
15

Table of Contents

Related product manuals