EasyManua.ls Logo

Shibaura SG280E - MAINTENANCE AFTER THE WORK; Routine Post-Operation Maintenance

Shibaura SG280E
57 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
33
3333
33
SECTION 7-MAINTENANCE AFTER THE WORK
7
77
7
1. Maintenance Services after Operation
Before covering the vehicle with a sheet,
stop the engine and wait for the engine and
muffler to cool down completely.
After opera
tion, wash the machine in water,
wipe away the moisture completely, and apply
grease to each grease nipple.
Before starting inspections, maintenance
services or repairs, be sure to stop the
engine. If not, you may be caught by
moving parts of the machine and injured.
Start the inspections or maintenance
services after heated parts of the muffler
and engine have completely cooled down.
If not, you may be burnt.
[Cautions for Handling]
Avoid water from being splashed on electric
parts as far as pos
sible. If not, electric parts
may be damaged.
Danger
Caution
2. Opening/closing the bonnet
(1) Release the right and left bonnet catches.
(2)
While pushing the left lock pin in the bonnet
front with a round rod, raise the bonnet.
(Make sure that the bonnet lock is unlocked.)
(3)
Raise the bonnet until the bonnet supporting
point is exceeded.
(4) To close the bonnet, push it down.

Other manuals for Shibaura SG280E

Related product manuals