Start at the bottom overhanging the felt approximately 40mm down the 3 walls.
Nail into the end wall at 100mm centres. Then gently tighten the felt and fix with 2 nails at the top.
Overlap the next piece of felt by about 400mm and nail just above the overlap as before. Again tighten
and fix at the top with 2 nails.
At the top again overhanging the felt approximately 40mm down the 3 walls. And nail as before,
GB-IE
30
9mm Felt nails
(A0266) x98
8
1.4m Felt strips
(A0577)x03